Basic Barium Dinonylnaphthalene Sulfonate (Carbonated) Chorus Ba-29C
Introduction
Chorus Ba-29C is an oil-soluble rust inhibitor. Its rust-preventive performance is similar to Antirust Additive Chorus Ba-29B and Chorus-BSN.
It has a similar acid-neutralizing ability to Chorus Ba-29B. It is alkalinity reserve comes from oil-soluble barium carbonate, it does not react with esters, its TBN is less affected by water, and has a more stable base value than Chorus Ba-29B.
It is more suitable for rust prevention in non-ferrous metals than Chorus Ba-29B.


Applications
Excellent anti-rust additives used in internal combustion engine oil, hydraulic oil, paper machinery oil, instrument oil, circulating oil, etc.
Specifications
| Item |
Typical Value |
Test Method |
| Appearance |
Clear Brown Viscous Liquid |
Visual |
| Viscosity(100°C), mm²/s |
50-100 |
GB/T265/ISO3104 |
| Water Content, % |
≤0.2 |
GB/T260/JISK0068 |
| Barium Content, % |
≥11.4 |
GB/T 2433/JISK2272 |
| Color (diluted), |
1.0-4.0 |
GB/T6540/ISO2049 |
| Flash Point(COC),°C |
≥160 |
GB/T3536/ISO2592 |
| Density(20ºC), g/cm3 |
1.00-1.10 |
GB/T2540/ASTMD4052 |
| TBN mgKOH/g |
40-50 |
GB/T7304/ASTMD4739 |
| Cl Content (PPM) |
≤10 |
MicrocoulometricMethod |
Our Factory:
We have a standardized production workshop of nearly 8000 square meters, 6 production lines. There are more than 60 workers, 15 salesmen, 20 technical en gineers and 4 after -sales service team to make us able to provide good prod ucts and service. We have a complete factory production, quality control and delivery process, as well as a complete after-sales service system. All our products are provided with quality warranty and lifetime free after-sales service.
Package, Handle & Storage
Storage: Store in a cool,dry place away from any direct source of heat and moisture. Maximum recommended storage temperature is 45ºC.
Shelf life: 3 years. If beyond the storage period, it can still be used after passing the test.
Package: N.W. 200kg / 200L drum.
Test & QC
The raw materials were inspected before entering the factory to ensure that the requirements were met.
During the production process, sampling inspection, real-time monitoring, and correction.
After the production is finished, each batch of goods shall be sampled and tested to make sure the goods are qualified before leaving the factory.